Good conditions — go prepared. In cloud on Socialist Peak — whiteout risk
Best day: Sun 29 Nov (75)
- Max altitude
- 4,566 m
- Duration
- 3–4 days
- Grade
- Strenuous (exposed crater-rim ridge)
- Best seasons
- Jun – Oct, Jan – Feb
Tanzania · Kilimanjaro · Live
Live 0–100 summit scores for the Machame, Lemosho, Marangu and Rongai routes on Kilimanjaro, plus Mount Meru — built from altitude-corrected forecasts at every camp, summit-night wind and cold, snow on the crater rim, rain on the forest trails and the latest closures, including fires.
Updated (12:30 UTC)
Best right now: Mount Meru 69 Good
Best day ahead: Mount Meru on Sun 29 Nov (75)
Live map
Each route is drawn from its camps and coloured by today's live score. Markers sit on each route's start gate (the four Kilimanjaro routes meet at Uhuru Peak). Select a route for its full forecast.
Every route · best first
Score for the next 24 hours, what's driving it, and the 7-day outlook. Open the route guide for camps, permits and the hour-by-hour summit night.
Good conditions — go prepared. In cloud on Socialist Peak — whiteout risk
Best day: Sun 29 Nov (75)
Fair — manageable with care. In cloud on Uhuru Peak — whiteout risk
Best day: Tue 1 Dec (68)
Fair — manageable with care. In cloud on Uhuru Peak — whiteout risk
Best day: Tue 1 Dec (68)
Fair — manageable with care. In cloud on Uhuru Peak — whiteout risk
Best day: Tue 1 Dec (64)
Fair — manageable with care. In cloud on Uhuru Peak — whiteout risk
Best day: Tue 1 Dec (64)
At a glance
| Route | Today | Max altitude | Days | Grade | Best seasons | Permits |
|---|---|---|---|---|---|---|
| Mount Meru | 69 Good | 4,566 m | 3–4 | Strenuous (exposed crater-rim ridge) | Jun – Oct, Jan – Feb | Arusha National Park fees (conservation, hut, rescue), Armed ranger escort |
| Kilimanjaro — Rongai Route | 64 Fair | 5,895 m | 6–7 | Strenuous (non-technical, extreme altitude) | Jan – early Mar, Jun – Oct | Kilimanjaro National Park fees (conservation, camping/hut, rescue), Licensed guide |
| Kilimanjaro — Marangu Route | 63 Fair | 5,895 m | 5–6 | Strenuous (non-technical, extreme altitude) | Jan – early Mar, Jun – Oct | Kilimanjaro National Park fees (conservation, camping/hut, rescue), Licensed guide |
| Kilimanjaro — Lemosho Route | 56 Fair | 5,895 m | 7–8 | Strenuous (non-technical, extreme altitude) | Jan – early Mar, Jun – Oct | Kilimanjaro National Park fees (conservation, camping/hut, rescue), Licensed guide |
| Kilimanjaro — Machame Route | 55 Fair | 5,895 m | 6–7 | Strenuous (non-technical, extreme altitude) | Jan – early Mar, Jun – Oct | Kilimanjaro National Park fees (conservation, camping/hut, rescue), Licensed guide |
Closures · fires · disruption
The most important recent reports merged across all routes — closures first, then disruptions and reopenings. Advisories are published by CoastMetric: open the linked source before you rely on it.
No closures or major disruption reported in the last 14 days across the routes we monitor.
Unlike Nepal, Tanzania publishes no real-time rain or river gauges or verified-incident feed for Kilimanjaro or Meru. Rain here is modelled (MET Norway, which tends to over-forecast dry-season rain on Kilimanjaro), so treat rain and slope levels as indications.
When to go
A general guide for Kilimanjaro and Meru; each year differs, so use it to plan and the live scores to decide. Right now: Short rains — Afternoon showers and storms in the forest zone; mornings are often clear. Fewer climbers.
Dry, clear and the busiest time. June–August has the coldest summit nights and occasional strong upper winds; September–October is milder. Moorland fires are most likely late in the dry season.
Warmer, often very clear, with occasional showers and snow on the summit. A favourite window with fewer crowds than July–August.
The wettest period, peaking in April: muddy, slippery forest trails, cloud and heavy snow on Kibo. Rongai on the drier north side is the usual choice.
Afternoon showers and storms in the forest zone; mornings are often clear and the summit nights are workable.
Plan & stay safe
Rules and fees change often. Treat this as an overview and confirm details with Tanzania National Parks (TANAPA) and your licensed operator before you travel.
A climb is a route, not a point. We forecast every camp hour by hour, corrected to its real altitude, and combine six factors: the summit night (00:00–10:00 on the crater rim and summit), snow & ice on the summit route, rain & slopes against a global landslide rainfall threshold, trail weather, dawn views and the road to the gate.
Credible closure and fire reports cap the score. 80+ Excellent · 65+ Good · 50+ Fair · 35+ Poor · <35 Avoid. The full method is on each route's page, e.g. Mount Meru conditions.
Not an official forecast. Always follow TMA warnings, KINAPA/TANAPA rangers and your guide.
FAQ
Right now 1 of 5 routes we track score Good or better, 4 Fair and 0 Poor or Avoid. Short rains: Afternoon showers and storms in the forest zone; mornings are often clear. Fewer climbers. Conditions change within hours on a 5,895 m mountain — check the live score for your route and always follow TMA warnings, park rangers and your guide.
Mount Meru has the highest score right now: 69/100 (Good). In cloud on Socialist Peak — whiteout risk Looking ahead, the best day in the 7-day outlook is Sun 29 Nov on the Mount Meru (score 75).
The dry seasons — roughly January to early March and June to October — are best. The long rains (mid-March to May, wettest in April) bring muddy forest trails, cloud and heavy snow on the summit; the short rains (November to December) bring afternoon showers. June to August has the coldest summit nights.
Longer routes acclimatise better and have higher summit success: Lemosho (7–8 days) and Machame (6–7 days) cross the Shira plateau and use Lava Tower for "climb high, sleep low". Marangu (5–6 days) is the only hut route but the shortest itinerary. Rongai approaches from the drier north side and suits the rainy seasons. Mount Meru (3–4 days) is the classic acclimatisation climb before Kilimanjaro.
Yes. Climbing Kilimanjaro without a registered guide and crew is not permitted; park fees are paid through a licensed operator. On Mount Meru an armed park ranger must accompany every group because of buffalo and elephant in the forest.
Park fees go to Tanzania National Parks (TANAPA) through your operator. Mount Meru: Arusha National Park fees (conservation, hut, rescue), Armed ranger escort. Kilimanjaro — Rongai Route: Kilimanjaro National Park fees (conservation, camping/hut, rescue), Licensed guide. Kilimanjaro — Marangu Route: Kilimanjaro National Park fees (conservation, camping/hut, rescue), Licensed guide. Kilimanjaro — Lemosho Route: Kilimanjaro National Park fees (conservation, camping/hut, rescue), Licensed guide. Kilimanjaro — Machame Route: Kilimanjaro National Park fees (conservation, camping/hut, rescue), Licensed guide. Fees and rules change — confirm with TANAPA and your operator.
Medical guidance (Wilderness Medical Society) is to raise your sleeping altitude by no more than about 500 m a night above 3,000 m, with a rest day every 3–4 days. Every standard Kilimanjaro itinerary goes faster than that, which is why longer routes succeed more often. Drink enough, go slowly ("pole pole"), and never continue with worsening headache, vomiting, confusion or breathlessness at rest — descent is the treatment.
The summit push starts around midnight from the high camp (about 4,700 m). Air temperatures on the crater rim are usually well below freezing and wind chill can reach −20 °C or lower. Our summit-night factor uses the forecast wind at summit height, not the sheltered model wind, and shows the hour-by-hour window.
Each route is scored 0–100 from hourly forecasts at every camp, corrected to its real altitude. Six factors are combined: summit-night wind, cold and cloud, snow and ice on the summit route, rain on the forest and ravine sections against a global landslide rainfall threshold, trail weather, dawn views and the road to the gate. Reported closures and fires cap the score. 80+ is Excellent, 65+ Good, 50+ Fair, 35+ Poor and below 35 Avoid.